Healthcare & MedTechDWTC & DEC, Expo City Dubai

WHX Dubai exhibition stands at DWTC and Expo City

WHX Dubai takes place at Dubai World Trade Centre and Dubai Exhibition Centre at Expo City Dubai. EGS plans healthcare exhibition stands around your allocated venue, equipment and approved brief.

Check your venue, hall and stand allocation in the official WHX exhibitor information. An earlier event’s drawings or access arrangements are not the specification for a new edition.

Technical guidance: Dr. Haider, Manager · Updated 28 October 2026

Dubai contractor services

Start with the allocated venue

VenueWhat to confirmPlanning resource
Dubai World Trade Centre (DWTC)Hall, floor plan, access, service orders and the current event’s technical requirements.DWTC stand planning
Dubai Exhibition Centre (DEC), Expo City DubaiAllocated hall, delivery arrangements, equipment access and current organiser instructions.DEC stand planning

Brief medical displays around the actual equipment

Provide equipment dimensions, weights, power requirements, ventilation needs and the supplier’s operating restrictions. Explain whether a device is a static display, a demonstration unit or part of an authorised live activity. Any structural, clinical or specialist operating requirement needs its own review.

Display structures and movement

Plan supports and load distribution for the actual equipment. Confirm delivery routes, door clearances, lifting arrangements, floor loading and inspection responsibilities with the organiser and relevant specialists before fabrication.

Demonstrations, lighting and screens

Share the demonstration programme and screen content. Specify sightlines, lighting, cabling and sound requirements around what visitors need to see and hear, rather than applying one generic medical lighting or AV specification.

Meetings, storage and surfaces

Define seating, consultation privacy, accessible circulation, secure storage and material finishes. Discuss cleaning needs and any documented certification requirements; a healthcare exhibition does not make every stand a sterile treatment area.

Agree the responsibilities before production

The proposal should identify design, fabrication, graphics, furniture, equipment, specialist supply, venue services, installation, testing, handover and removal. Confirm who prepares submissions, who orders utilities and which costs or approvals remain outside the contractor’s scope.

Use the stand budgeting and quotation checklist to compare proposals with the same brief. For applicable rules and deadlines, use your current organiser manual and written venue instructions.

Review relevant project evidence

Explore the healthcare-labelled examples below and the published Philips Riyadh project record. A past project is evidence to discuss, not approval for a new stand at another venue.

WHX and Arab Health planning questions

Is Arab Health now WHX Dubai?

World Health Expo (WHX) Dubai is the evolution of Arab Health. Use the current WHX exhibitor information for the edition you are attending rather than relying on a previous Arab Health manual.

Where does WHX Dubai take place?

WHX Dubai takes place at Dubai World Trade Centre (DWTC) and Dubai Exhibition Centre (DEC) at Expo City Dubai. Confirm your allocated venue, hall and stand number before commissioning drawings, ordering services or arranging delivery.

What should I provide for a healthcare stand quotation?

Share the event edition, allocated venue, floor plan, dimensions, open sides, equipment dimensions and weights, demonstration plan, meeting needs, artwork, budget and required handover time. Identify which power, connectivity and other venue services have already been ordered.

Do all healthcare stands need the same engineering and finishes?

No. Display equipment, demonstrations, materials and venue requirements vary. Agree any structural review, electrical supply, surface specification, accessibility and specialist services in the written scope. A display stand is not automatically a clinical or sterile environment.

When should we appoint a contractor?

Begin once the organiser supplies your allocation and current exhibitor manual. Work backwards from the actual drawing-submission, service-order and move-in deadlines. Complex equipment and structures may need additional design and review time.

Planning a WHX stand at DWTC or Expo City?

Send the allocated venue, hall, floor plan, equipment schedule, dimensions and handover deadline so the team can review the production scope.